The company is implementing the Riverside Urban Area Infrastructure Construction Contract, covering technical infrastructure works to support the development and operation of the urban area.
Contract Information
Project Name: Riverside Urban Area
Project Type: Technical Infrastructure
Scope: Transportation Infrastructure and Drainage Systems
Implementation Period: May 2026 – April 2027
Status: In Progress
Scope of Work
- Site leveling and preparation.
- Construction of internal road systems.
- Construction of stormwater and wastewater drainage systems.
- Construction of sidewalks and related infrastructure works.
- Coordination and implementation of underground utility systems.
- Inspection and acceptance of completed works at each stage.
Implementation Schedule
The project commenced in May 2026 and is expected to be completed in April 2027. Construction activities are organized by specific areas to optimize the overall schedule and ensure consistency across the infrastructure system.
Quality Commitment
The company is committed to implementing the project in accordance with technical requirements while ensuring quality, safety, and timely completion, contributing to the development of a comprehensive and integrated infrastructure system for the urban area.