Homepage / News / Ninh Cuong Bridge Project – National Highway 37B (2025)

Ninh Cuong Bridge Project – National Highway 37B (2025)

Ninh Cuong Bridge, spanning the Ninh Co River along National Highway 37B, is a key infrastructure project contributing to the improvement of the transportation network connecting Nam Dinh, Thai Binh, and Ninh Binh provinces. In 2025, the project was implemented by the Thang Long Project Management Board with the aim of delivering a modern and safe bridge capable of meeting growing transportation demands.

Thống Nhất participated in the project as a consulting firm responsible for reviewing the technical design documents, cost estimates, and land clearance boundary stakeout design. Our team of experts conducted a comprehensive review of structural solutions, assessed load-bearing capacity and durability, and evaluated investment costs to optimize the overall effectiveness of the project. Beyond ensuring compliance with technical standards, we placed particular emphasis on long-term operational sustainability and construction safety.

The Ninh Cuong Bridge is expected to shorten interprovincial travel distances and facilitate the development of logistics, trade, and services. At the same time, the project will strengthen connectivity across the key economic areas of the Northern Delta, reinforcing Thống Nhất’s role in strategically important national infrastructure projects.

Leave a Reply

Your email address will not be published. Required fields are marked *