Author Archives: Uy Tran

Digitalization of Management and Data Storage

Thống Nhất is gradually digitalizing the management of project records, documents, and data to build an integrated information system that enables easy and efficient access. The application of digital technologies helps reduce manual tasks, improve management efficiency, and facilitate better coordination among departments.

HANOI PLANS A “THREE-DIMENSIONAL CITY”: DEVELOPING AN UNDERGROUND URBAN LAYER

Under Hanoi’s 100-year Capital development vision, underground space is planned as an interconnected urban structure closely integrated with the urban railway (Metro) network, helping reduce pressure on surface infrastructure. 1. Scientific Depth Zoning 0–15 m: Public-use facilities, including pedestrian walkways, parking areas, technical infrastructure, and Metro entrances. 15–30 m: Engineering infrastructure, including deep-level Metro lines,

Improvement of Construction Methods

Research and development activities focus on improving construction methods, optimizing workflows, and enhancing productivity on construction sites. Through these efforts, Thống Nhất aims to shorten project implementation time, utilize resources efficiently, and ensure consistent construction quality.

Dong Nam Factory Construction Contract

The company has officially commenced the Dong Nam Factory Construction Contract, further expanding its construction capabilities in the field of industrial facilities and technical infrastructure. Contract Information Project Name: Dong Nam Factory Project Type: Industrial Construction Scope: Factory Building and Technical Infrastructure Construction Implementation Period: March 2026 – December 2026 Status: In Progress Scope of

Road and Transportation Infrastructure Design

Road design is a key field in the development of transportation infrastructure, requiring a balanced consideration of technical requirements, safety, economic efficiency, and actual terrain conditions. The design process includes route alignment studies, geometric road design, subgrade and pavement design, drainage systems, intersections, and auxiliary structures. Design alternatives are developed based on survey data and

Knowledge Sharing and Team Development

Thống Nhất encourages knowledge and experience sharing among engineers, experts, and employees across the company. Experience gained from real-world projects is shared and passed on within the organization, contributing to the continuous development of the team’s capabilities and improving the quality of project implementation.

Riverside Urban Area Infrastructure Construction Contract

The company is implementing the Riverside Urban Area Infrastructure Construction Contract, covering technical infrastructure works to support the development and operation of the urban area. Contract Information Project Name: Riverside Urban Area Project Type: Technical Infrastructure Scope: Transportation Infrastructure and Drainage Systems Implementation Period: May 2026 – April 2027 Status: In Progress Scope of Work

Transportation Infrastructure and Engineering Design

Transportation infrastructure and engineering design requires close coordination among multiple disciplines to develop an integrated, efficient, and reliable infrastructure system. The scope of work may include roads, bridges, culverts, drainage systems, auxiliary structures, and other related technical infrastructure. Through site surveys, analysis of existing conditions, and the selection of appropriate engineering solutions, projects are designed